Most planning applications that change how a site deals with rain need two closely related documents: a drainage strategy and, where policy requires it, a flood risk assessment. They are not the same report, but they should tell a consistent story about the land, the water and the proposed design.
What a flood risk assessment covers
A flood risk assessment is a site-specific report. It looks at flood risk to the development, and from it, over the lifetime of the scheme. In UK practice that means considering all relevant sources, not only rivers: surface water, groundwater, sewers and any tidal or coastal risk that applies. The National Planning Policy Framework and the Planning Practice Guidance set the policy tests the report has to meet, including how people and property will be kept safe and how risk will not be pushed onto land nearby.
What a drainage strategy should show
A drainage strategy explains how surface water will be managed on the site. It should show where runoff will go, in the accepted order of preference: reuse and infiltration first, then a watercourse, then a surface water sewer, and a combined sewer only if other routes are not viable. It should set out the proposed sustainable drainage systems, the storage they provide, the rates at which water will leave the site, exceedance routes if a design storm is exceeded, and who will maintain the system.
Typical components include permeable paving, planted features such as rain gardens, and, where infiltration is limited, attenuation tanks or basins with a flow control. The strategy should also reflect the National Standards and, for major development, advice from the Lead Local Flood Authority.
How the two reports work together
The flood risk assessment sets the risk context and the safety case. The drainage strategy is the engineering response for surface water. If the numbers, assumptions or climate-change allowances do not match, the planning authority or the lead local flood authority will usually come back with questions. Starting both pieces of work from the same survey, infiltration testing and layout saves time later.