A soakaway test is usually the first piece of hard evidence in a surface water design. Before anyone can say that rainwater will soak into the ground, someone has to dig a hole, fill it with water and measure how quickly it drains. In the UK that test normally follows the method in BRE Digest 365, and its result shapes almost every decision that follows in a scheme of sustainable drainage systems.
This guide explains what the test is for, how a BRE 365 infiltration test is carried out, how the result is worked out and what it means for your design. It is written for developers, architects and homeowners who need to understand the process, not only the engineers who run it.
Why infiltration testing comes first
UK drainage guidance sets out an order of preference for where surface water should go. Building Regulations Approved Document H, national planning guidance and the SuDS Manual all put infiltration into the ground at or near the top of that list, ahead of discharge to a watercourse and well ahead of discharge to a sewer. If the ground can accept water, a soakaway, an infiltration trench or an infiltrating pavement may deal with some or all of the runoff from a site.
That preference only holds if it is proven. Planning authorities and lead local flood authorities generally expect infiltration to be backed by site-specific test results, not by assumptions from a geological map or from a neighbouring plot. A drainage strategy that relies on infiltration without test data is one of the most common reasons for a consultee to raise questions.
What BRE Digest 365 is
BRE Digest 365, Soakaway design, is a guidance document published by BRE. It sets out a field test for measuring the infiltration rate of the soil and a method for sizing a soakaway from that rate. It has been the standard reference for soakaway design in the UK for many years, and Approved Document H refers designers to it for surface water soakaways. The SuDS Manual from CIRIA also draws on the same principles in its guidance on infiltration.
It is worth separating this from the percolation test in Approved Document H for wastewater drainage fields, such as those serving a septic tank or package treatment plant. That test uses a smaller hole and produces a different value, expressed as the time taken for the water level to fall by a set amount. It answers a different question, and the two results should not be used interchangeably.
How a BRE 365 soakaway test is carried out
The test is simple in principle, but the details matter. A typical procedure looks like this:
- Plan the locations. Test where the infiltration features are likely to go, and at the depth they will work at. A shallow feature such as permeable paving needs a shallow test; a deep crate soakaway needs a deeper one. Larger sites need several test locations, because ground conditions can change across a short distance.
- Excavate a trial pit. The pit is dug with vertical sides, usually with a mini excavator, to the depth of the proposed soakaway. The size and shape are recorded carefully, because the calculation depends on them. If the sides are likely to collapse, the pit can be filled with clean granular material and the free volume within that fill is allowed for in the calculation.
- Fill the pit quickly. Water is added rapidly, often from a bowser or tanker, until the pit is close to full.
- Record the fall in water level. Readings of water depth are taken at regular intervals against time until the pit is nearly empty, or until it becomes clear that the level is barely moving.
- Repeat the test. BRE 365 asks for the pit to be filled and emptied three times, in quick succession, on the same day or on consecutive days. Each fill wets the surrounding soil further, so the infiltration rate usually falls with each cycle.
- Make the site safe. Nobody should enter an unsupported excavation. Pits should be fenced or covered while open and backfilled once the test is complete.
How the infiltration rate is calculated
The result is a soil infiltration rate, normally expressed in metres per second. BRE 365 uses the part of the test between 75% and 25% of the effective water depth, which avoids the less reliable readings at the very start and end of each cycle.
In plain terms, the calculation takes the volume of water that drained away between those two levels and divides it by two things: the internal surface area of the pit in contact with water at half depth, including the base, and the time it took for the level to fall from 75% to 25%. The lowest rate from the three cycles, which is usually the last one, is the figure taken forward for design.
Good test records include the pit dimensions, the soil found at each depth, any groundwater seen during digging, the weather before and during the test, and a full table of readings for each cycle. A short report that shows its working is far more useful to a reviewer than a single number on a drawing.
What the result means for design
A measured rate is not the end of the story. The designer applies a factor of safety to it, with the SuDS Manual giving guidance on choosing a factor based on the size of the area drained and the consequences if the feature fails. The design rate is then used to size the soakaway or infiltration feature for the required storm, including the climate change allowance for the development, and to check how long it takes to drain down so that it is ready for the next storm.
Broadly, the outcome falls into one of three groups:
- Good infiltration. Sands, gravels and some chalk and limestone ground can accept water well. Soakaways, infiltration trenches, infiltrating permeable paving and planted features can all play a part.
- Limited infiltration. Some water soaks away, but too slowly to deal with a design storm on its own. A hybrid approach is common: partial infiltration from shallow features, with storage and a controlled outfall for the remainder.
- Little or no infiltration. Many clay soils barely drain during a test. In that case, a soakaway is the wrong component, and the design moves down the hierarchy to attenuation with a flow control to a watercourse or sewer.
Constraints the test does not tell you about
A good infiltration rate does not, by itself, make infiltration acceptable. Designers also need to check:
- Groundwater levels. There needs to be unsaturated ground beneath the base of the feature, taking seasonal high groundwater into account. A test in a dry summer can give a more optimistic picture than the ground would offer in a wet winter.
- Distance from buildings. Concentrated infiltration close to foundations can soften the ground or cause settlement, so soakaways are kept a safe distance away from buildings and other structures.
- Ground stability. Ground prone to dissolution, such as some chalk, or areas of old mining or unstable slopes, may make infiltration unsafe.
- Contamination and groundwater protection. Infiltrating through contaminated land, or into sensitive aquifers and groundwater source protection zones, may be restricted or need extra treatment upstream.
- Made ground. Fill material can vary sharply from one pit to the next and can behave differently once it is saturated.
Desk study information, borehole logs and Environment Agency or Natural Resources Wales guidance should be reviewed alongside the test results.
Timing and common mistakes
Infiltration testing is best done early, ideally before the site layout is fixed, so the drainage can follow the ground rather than the other way round. Typical problems include testing at the wrong depth, testing in one corner of a large site and applying the result everywhere, stopping after a single fill, and not recording groundwater or soil types. Testing in a tidy, compacted spot that does not represent the area where the feature will be built can also give a misleading answer.
Results from a test should also be read with care once construction starts. Heavy plant can compact the ground where an infiltration feature is planned, so those areas are best protected during the works.
Getting help with your soakaway test
A clear, well-recorded soakaway test makes the rest of the design easier, whether it confirms infiltration or rules it out. If you are planning a development, an extension or a retrofit and need to know what the ground will accept, our team can help with testing, interpretation and SUDS design and installation across the UK. Get in touch to talk through your site.